Level 1
A piece of a wall with swollen paint. Nothing serious, but it might become a problem soon.
6 levels
Level 1
A piece of a wall with swollen paint. Nothing serious, but it might become a problem soon.
Level 2
Takes 720 min
A piece of wall with heavily swollen paint. Water is seeping from the wall. You definitely need to do something about it. Wipe the floor, maybe.
Needs
Gives
Level 3
Takes 1440 min
A piece of wall with heavily swollen paint. Part of the paint fell off. Water is seeping from the wall. There seems to be something behind this wall.
Needs
Gives
Level 4
Takes 180 min
A wall with a hidden door. You don't know who made it and why, but to open it, you will need tools. Also, another wipe wouldn't hurt.
Gives
Level 5
Takes 180 min
The damaged part of the wall turned out to be an entrance to the old hidden room. There is nothing inside but rubbish and a dead body. It will take a lot of effort to put this room in shape.
Gives
Level 6
Takes 720 min
A tidied up entrance to the new room.
Needs
Gives